Smart Card and Biometric Time Attendance & Access Control Systems. High Security Access Control Barriers, Gates and Turnstiles. Automatic Number Plate
Recognition
and Digital CCTV Camera and Recording Systems. Tensor PLC - the name you can trust for Time Attendance, Access Control and Visitor Monitoring.

Request Call Back E-Mail Tensor
UK Site USA Site Page Française Página Española
            
buy fulltime and attendance systemonline shop trial software customer training and support
free security audit
tensor in the community
book a demo




Tensor gets Plastered Fri 18th February 2005
Astins Ltd install Win TA Lite

Astins Ltd are a major dry lining and plastering contractor of mixed sized contracts in southern England with head offices in Croydon, Surrey. They are a main contractor for the Dry Lining and Plastering at the site of the New Romford Hospital; a multi million pound project where Astins will be working for approximately two years. Over 200 people work in the company of which around 90 are at the Romford site.

In October 2004, Quantity Surveyor, Andy Barber, wanted to install a Time and Attendance system to see who was on site and to check the hours worked by the skilled craftsmen. In particular he wanted to streamline the existing clocking system they had at that time. Andy looked at systems from Time Ware and a few other companies as well as Tensor.

Tensor was selected because “Tensor Smart Cards can be read through a safety glass window, so the clock could be located on the inside of the building where it was safe and could not be interfered with”.

A WinTA Lite Smart Card clocking system was installed in November 2004. There were no problems with the hardware installation which was carried out by Astins' technical staff. They had a few software issues that were swiftly resolved by the Tensor Helpdesk, who were described as “Fantastic” by Zoe Jackaman, the Office Administrator. Zoe was trained on-site, by a Tensor Training Consultant. She described the quality of the training as “Very Good”.

When asked what she liked about the WinTA Lite system, Zoe said “Easy to use, we have plenty of mixed labour on site and it's simple enough for them to get it right - they have taken to it very easily.

Astins do not use the Fire Roll Call feature of WinTA Lite but they do use the Mimic Panel feature to monitor who is on site. Contractors and other visitors must register themselves 'onto site' if they come on for other means which allows Astins to use WinTA Lite to report all personnel present at any given point in time.

Astins Ltd install Win TA Lite

Zoe has used the Tensor Helpdesk and described the service as “Excellent”. When asked how Tensor could improve their service to Astins, Zoe said “Don't think you could, we are more than happy with the service

When asked what she liked most about Tensor, Zoe said “Simplicity” and would Astins recommend Tensor to other companies? “Yes, definitely.” was the retort.

Finally summing up Tensor in a few words, Zoe said “Reliable and easy to use.

Company Information

Astins Ltd are a major constructor of Dry Lining who can handle all mixes of size of contracts, large or small, in southern England.

Astins Ltd
Suite 34-40 Challenge House
616 Mitcham Road
Croydon
Surrey
CR0 3AA

Tel: 020 8664 9401
Fax: 0208 6649404

Email: info@astins.com

Access Control | Gates, Barriers & Turnstiles | Biometrics | Digital CCTV | Fingerprint Recognition | Key Fobs
Personnel Software | Prison Monitor | Smart Cards | Time Attendance | Visitor Control
Tensor gets Plastered
Tensor plc Hail Weston house, Hail Weston, St Neots, Cambs, PE19 5JY Tel +44 (0)1480 215530 Fax +44 (0)1480 223966 Company Number 02718543 VAT 605952045
Copyright © 2010 Tensor plc. All rights reserved. PLC. All Rights Reserved
Please visit our other sites
Access Control Systems | Attendance | Car Park Barriers | CCTV Security Cameras | Fingerprint Reader | Save Energy | Visitor Management | Turnstile
Tensor gets Plastered